The residential complex Z119 is being under active construction process on Zelena Street in Lviv. The monolithic reinforced concrete frame was fully mounted (pylons, columns, walls, stairs, overlap and coatings). Besides, the external brick walls from the first to the fifth living floor, internal and interroom partitions are being molded. Works on the arrangement of the parapet over the roof slab are already in process.IMG_20180510_090836

Decoration of the outside and inside of the multi-apartment dwelling is about to end on the Boykivska Street. The construction of the frame and walls is already completed. Also the arrangement of landscaping is almost over.

 

image005

image004

At the moment, active work is being carried out on the construction in the Pasiky-Zubrytski village of Pustomyty district in Lviv region. The installation of frame is completed; the façade is being constructed, as well as the preparation of the floor base and the placement of external engineering networks.

 

IMG_0094

IMG_0095